Execution of civil engineering works required for the construction of 24 wind turbines, each generating 2.5 MW, in the town of Chirnogeni (Constanta). The works include building:

  • Access roads to the turbines and associated drainage work.
  • Wind turbine foundations. Includes earthmoving and laying foundations.
  • Trenches and laying cables between turbines and substation.