Execution of civil engineering works required for the construction of 24 wind turbines, each generating 2.5 MW, in the town of Chirnogeni (Constanta). The works include building:
- Access roads to the turbines and associated drainage work.
- Wind turbine foundations. Includes earthmoving and laying foundations.
- Trenches and laying cables between turbines and substation.