Archive

Office building with 20 above-ground stores and 9 underground stores. The floors intended for office have a surface between 700 and 800 m². The floors intended for parking have an approximate surface of 900-1000 m². The building is located in a rectangular plot measuring 50 m...

At 48 km Line 9 will be the longest metro line anywhere in Europe and is to have 52 stations. It will cross the city of Barcelona and provide a superb communication link for neighbourhoods with the greatest demand for public transport in the city....

Includes the following components: • Dam. • Spillway. • Drains and intakes. • Pump stations. • Restoration of access road to Lechago. • Internal roads. • Administration buildings. • Environmental impact corrective measures. • Erosion protection. • Emergency plan. Dam on the Pancrudo River some 1,300 m upstream of the mouth of the river where it...

The new sanitation system in Alto Maresme, to the north of Barcelona, consists of a pre-treatment plant, pumping station, one Wastewater Treatment Plant (WWTP) and collectors that connect the station to the WWTP. The municipalities that incorporate the sanitation network in question, are Pineda de...