Archive

This monumental medieval cathedral was built between the 11th and the 18th centuries, covering various periods from the Romanesque to the Baroque. Its main nave, built between the 15th and 16th centuries, is the widest Gothic vaulted space in the world (23 m)....

Grupo Copisa has concluded its participation in executing the Torito Hydroelectric Project, which is a project within the construction of the Torito Hydroelectric Plant in Costa Rica, owned by Global Power Generation, a subsidiary of the international generation of Gas Natural Fenosa. This plant is...

General Description of the Current Building: The building the subject of the project is the existing Hotel AC Diplomatic, which was built in two phases: the first at the end of the 1960s and the second at the beginning of the 1970s, to projects by Luis...

New hospital construction in Lima. The new hospital in the area of ATE Vitarte in Lima, Peru, will benefit a population of 565,215 people. With a surface area of 20,036 m², it is equipped with 155 beds for hospital admissions, 1 casualty unit, 38 outpatient...