The purpose of the project is the construction of a 100m long dock, the boat repair workshop and the construction of auxiliary facilities thereto. The dock is built with sheet pile type AZ28-700 of 18 m long, tied to a concrete anchor wall made on site....

Due to the earthquakes that affected the area of Tarapacá during April of 2014 and as a result of them, the berthing facility number 1 of Iquique Port was severely damaged, and the areas 1 and 2 became inoperable. The project of repair consists of the...

Principal actions: • Expansion of the Moll Central. • Installation of new levers. • Remodelling the current Moll de Ponent. • Remodelling the Moll de Ribera. • Dismantling of the existing petrol station at the Moll de Ribera and installation of a new one with higher capacity at the Moll...