Next Gas pipeline construction and assembly Lorca (Murcia) – Chinchilla (Albacete) section II north. Spain.

Category
Activities, Industrial projects, Pipeline works

Characteristics:
• Length (km): 92.1
• Diameter (in): 42” (1,067 mm)
• Pressure (bar): 80
• Pipe: API5L Grade X-70

 

Principal details:
• 4 valve positions
• 446 m horizontal perforations 56” (1,422 mm)
• 284,000 m³ excavation of trench in rock

 

Crossing R. Segura
Specific machinery for earth movements
Trench in rocky terrain
Cold bending of the piping
Alignment of piping