Turnkey construction of the new biodiesel plant (200,000 t per year) at Zierbana, the project included everything with the exception of the process line:
• Basic and detail engineering.
• Procurement of equipment and materials.
• Buildings, tank storage area (oil, biodiesel, methanol), truck loading area, pipes (1 km) to the dock, pigging system. Silo storage area, auxiliary systems (steam, cooling system, fire protection, natural gas, industrial air, N2 lines, H2SO4 lines, NaOH lines).
• Complete management of civil engineering, mechanical and electrical assembly, control and instrumentation.
• Testing: cold test and hot test.
• Commissioning.