Adif Alta Velocidad awards to the Joint Venture Copisa-EASA the works of the new station of Otero de Sanabria, included in the section Cernadilla-Pedralba de la Pradería of the North-Northwest Corridor of the high speed railway. The amount of the award is 4,009,940 euros (VAT included).
Adif Alta Velocidad awards to the Joint Venture Copisa-EASA the works of the new station of Otero de Sanabria
The project includes the execution of the following works: the new passenger building, the construction of a new section of 160 meters long that connects the road to access the siding for trains with the station; the urbanization of the station: access and pedestrian areas; parking on surface, a connecting walkway between platforms, stairs and ramp; platforms (floor, pavements and edge pieces); canopies and platform furniture, and replanting of slopes and restoration of the field of action.